Tianjin Jinyao Group Co., LTD
PROJECT REQUIREMENT
The application occasions of this project include water needle workshop, infusion workshop, freeze-dried powder needle workshop, comprehensive preparation workshop, laboratory and other air conditioning systems. Indoor requirements Air conditioning units to ensure good indoor air quality, accurate temperature and humidity control at the same time, need to be uninterrupted and efficient operation throughout the year. EK provides multiple batch EKDM combined air handling units and EKDX direct expansion air handling units. The main functional segments are: fresh air section, secondary efficiency filtration section, steam preheating section, pre-cooling coil section, primary return air section, surface cooling section, steam coil section, steam humidification section, fan section, flow section, sub-efficient filtration section, air outlet section.
Project location: Tianjin
Building use: Bio-pharmaceutical
Customer demand: The air conditions of temperature, humidity and cleanliness of the pharmaceutical workshop meet the requirements of GMP standards
Air conditioning equipment: More than 80 units of EKDM/EKDX combined air conditioners